NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
COLDArm Pressure-Sinkage Testing: Implications for Assessing Lunar TrafficabilityThe ability for regolith to support the movement of vehicles, known as trafficability, is commonly assessed using pressure-sinkage relationships [1]. Trafficability on the lunar surface is controlled by the site-specific physical properties of the regolith and the geometry and mass of the roving vehicle. Lunar regolith pressure-sinkage testing can be performed with standard exploration hardware (e.g., robotic arms with scoops) and will help define exploration routes and hazard zones for rovers and astronauts, as knowledge of the sinkage of a wheel in regolith helps constrain viable operating conditions for rovers. The objective of this study is to demonstrate the necessity of in situ testing and characterization of lunar regolith physical properties for exploration and infrastructure development activities.
Document ID
20230002645
Acquisition Source
Kennedy Space Center
Document Type
Poster
Authors
J Long-Fox
(University of Central Florida Orlando, Florida, United States)
R Mueller
(Kennedy Space Center Merritt Island, Florida, United States)
E Bell
(Kennedy Space Center Merritt Island, Florida, United States)
K Dudzinski
(University of Houston Houston, Texas, United States)
B Peacock
(Kennedy Space Center Merritt Island, Florida, United States)
J Gleeson
(Kennedy Space Center Merritt Island, Florida, United States)
L Sibille
(Kennedy Space Center Merritt Island, Florida, United States)
R McCormick
(Jet Propulsion Laboratory La Cañada Flintridge, United States)
Eloise Marteau
(Jet Propulsion Laboratory La Cañada Flintridge, United States)
D Newell-Smith
(Jet Propulsion Laboratory La Cañada Flintridge, United States)
P Abel
(Glenn Research Center Cleveland, Ohio, United States)
Date Acquired
February 27, 2023
Subject Category
Engineering (General)
Meeting Information
Meeting: 54th Lunar and Planetary Science Conference (LPSC)
Location: Houston, TX
Country: US
Start Date: March 13, 2023
End Date: March 17, 2023
Sponsors: Lunar and Planetary Institute
Funding Number(s)
OTHER: SW 001
CONTRACT_GRANT: 80NSSC19M0214
Distribution Limits
Public
Copyright
Use by or on behalf of the US Gov. Permitted.
Technical Review
NASA Peer Committee
Keywords
Regolith
Trafficability
Moon
No Preview Available