Contractor Support Building #7 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Work PlanThis Work Plan documents the proposed field sampling activities for a per- and polyfluoroalkyl substances (PFAS) Site Assessment at the Contractor Support Building (CSB) #7 at Kennedy Space Center (KSC). The Work Plan provides a background of the historical activities that occurred at CSB #7, and the limited environmental investigations performed at CSB #7.

The proposed Site Assessment activities at CSB #7 include the advancement of a soil lithologic boring to 60 feet below ground surface, the installation of a staff gauge in site surface water, perform direct push groundwater sampling at eight locations, and collect four surface water samples. Sampling details, depths, and locations are presented in the Work Plan.

The Work Plan was presented to the KSC Remediation Team in the form of an Advance Data Package in February 2023. Following STRIVES approval, the CSB #7 PFAS Site Assessment Work Plan will be formally submitted to the Florida Department of Environmental Protection.
Document ID
20230002890
Acquisition Source
Kennedy Space Center
Document Type
Contractor or Grantee Report
Authors
Howard Franklin Fowler
(HydroGroLogic, Inc)
Date Acquired
March 2, 2023
Publication Date
January 1, 2023
Subject Category
Ground Support Systems and Facilities (Space)
Funding Number(s)
OTHER: Delivery Order 80KSC021F0168
CONTRACT_GRANT: 80KSC019D0012
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Professional Review
No Preview Available