Interim Measures Work Plan: South Repeater Building: Solid Waste Management Unit 121: Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances: Kennedy Space Center, FloridaThis document presents the design details of a granular activated carbon (GAC) hydraulic containment and groundwater treatment system Interim Measures Work Plan for the South Repeater Building site (South Repeater, Solid Waste Management Unit 121), located at John F. Kennedy Space Center (KSC), Florida. The interim measures (IM) treatment area includes the source area and downgradient property boundary, which have been impacted by per- and polyfluoroalkyl substances (PFAS). The objectives of the IM are to treat the source area and mitigate PFAS migration to areas outside of KSC boundaries. This document was prepared by AECOM Technical Services, Inc., for the National Aeronautics and Space Administration under Contract 80KSC019D0010, Task Order 80KSC021F0096.

The IM consists of the installation and operation of 19 extraction wells and an associated groundwater treatment system. A total of 13 wells will be installed to a depth of 34 feet below land surface (bls) to target the upper medium-grained sand with shell layer. A total of six wells will be installed to a depth of 56 feet bls to target the lower layer of poorly graded sand with shell fragments. The system will be designed to operate each extraction well simultaneously using submersible pumps at flow rates of 5 or 10 gallons per minute (gpm), excluding one extraction well with a flow rate of 30 gpm. The extracted groundwater will be conveyed to a groundwater treatment system, where it will be treated via GAC prior to disposal via infiltration.

To evaluate treatment system performance, baseline groundwater sampling will be conducted prior to treatment system startup. Performance monitoring will be completed quarterly for the first year. A total of eight performance monitoring wells will be installed to a depth of 12 feet bls, and eight performance monitoring wells will be installed to a depth of 30 feet bls. In addition to the installation of 16 performance monitoring wells, 12 existing monitoring wells will be incorporated into the performance monitoring program.
Document ID
20240013128
Acquisition Source
Kennedy Space Center
Document Type
Contractor or Grantee Report
Authors
Jackie Ceather
(Aecom (United States) Los Angeles, California, United States)
Megan E Garcia
(Aecom (United States) Los Angeles, California, United States)
Date Acquired
October 16, 2024
Publication Date
October 1, 2024
Subject Category
Engineering (General)
Environment Pollution
Funding Number(s)
CONTRACT_GRANT: 80KSC019D0010
TASK: 80KSC021F0096
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
NASA Technical Management
Keywords
groundwater treatment
hydraulic containment
groundwater
South Repeater Building
PFAS
No Preview Available