NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Materials and Process Activities for NASA's Composite Crew ModuleIn January 2007, the NASA Administrator and Associate Administrator for the Exploration Systems Mission Directorate chartered the NASA Engineering and Safety Center (NESC) to design, build, and test a full-scale Composite Crew Module (CCM). The overall goal of the CCM project was to develop a team from the NASA family with hands-on experience in composite design, manufacturing, and testing in anticipation of future space exploration systems being made of composite materials. The CCM project was planned to run concurrently with the Orion project s baseline metallic design within the Constellation Program so that features could be compared and discussed without inducing risk to the overall Program. The materials and process activities were prioritized based on a rapid prototype approach. This approach focused developmental activities on design details with greater risk and uncertainty, such as out-of-autoclave joining, over some of the more traditional lamina and laminate building block levels. While process development and associated building block testing were performed, several anomalies were still observed at the full-scale level due to interactions between process robustness and manufacturing scale-up. This paper describes the process anomalies that were encountered during the CCM development and the subsequent root cause investigations that led to the final design solutions. These investigations highlight the importance of full-scale developmental work early in the schedule of a complex composite design/build project.
Document ID
20120009267
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Polis, Daniel L.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 25, 2013
Publication Date
May 21, 2012
Subject Category
Composite Materials
Report/Patent Number
GSFC.CP.6204.2012
Report Number: GSFC.CP.6204.2012
Meeting Information
Meeting: SAMPE 2012
Location: Baltimore, MD
Country: United States
Start Date: May 21, 2012
End Date: May 24, 2012
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available