NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Dynamic Power Convertor Development for Radioisotope Power Systems at NASA GRCThe Thermal Energy Conversion Branch at NASA Glenn Research Center (GRC) is supporting the development of high-efficiency power convertors in support of Radioisotope Power System (RPS) development. Significant progress was made towards such a system that utilized Stirling conversion machines during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was cancelled in 2013 by the Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This new effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton designs. The technology development contracts each consist of up to three phases: Design, Fabricate, and Test. As of May 2018, all contracts have completed the Design Phase, and each underwent a design review with an independent review board. Two of the contracts have been awarded the Phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, NASA GRC is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating 10 convertors from previous development projects. Four of which are flexure-bearing based, and the other six are gas-bearing based. One of the flexure-bearing convertors has accumulated over 110,000 hours of operation, and holds the current maintenance-free heat-engine run-time record. Another flexure-bearing convertor was recently manually shutdown after 105,620 hours of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of runtime on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Amongst the gas-bearing convertors, the longest running unit has accumulated over 70,000 hours of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously, for which the longest runtime has reached 26,000 hours.
Document ID
20180007413
Acquisition Source
Glenn Research Center
Document Type
Presentation
Authors
Oriti, Salvatore
(NASA Glenn Research Center Cleveland, OH, United States)
Wilson, Scott
(NASA Glenn Research Center Cleveland, OH, United States)
Date Acquired
November 1, 2018
Publication Date
July 9, 2018
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
GRC-E-DAA-TN58682
Meeting Information
Meeting: International Energy Conversion Engineering Conference
Location: Cincinnati, OH
Country: United States
Start Date: July 9, 2018
End Date: July 11, 2018
Sponsors: American Inst. of Aeronautics and Astronautics
Funding Number(s)
WBS: WBS 138494.04.18.01.01.01
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available